internal testSystem Bootstrap field validation
Date · 2026-07-14
Scope · A fresh-context session in the connected Market Curator project environment.
Method · The participant received only the Bootstrap trigger, then had to locate the manifest, follow stable pointers, distinguish authority, identify gates, and return the required confirmation.
Result · Internal PASS after minor record defects were identified and corrected. The participant reached actionable project orientation without unsafe mutation.
Limitations · One project environment and one internal field-validation path do not establish broad portability or market efficacy.
Evidence · Detailed evidence is retained internally; public release has not been approved.
internal testCORE System Bootstrap v2.0 package review
Date · 2026-07-15
Scope · The first external-alpha package and its assessment framing.
Method · Internal review of package structure, authority distinctions, Operational Insight handling, portability framing, and public-disclosure boundaries.
Result · Prepared for controlled external evaluation as AIRIL's first implementation, currently delivered through documentation and disciplined workflows.
Limitations · Package readiness is not the same as a successful independent adopter outcome.
Evidence · Assessment summaries may be presented; package distribution remains controlled.
external alphaIndependent external-alpha evaluation
Date · Beginning 2026-07
Scope · Projects outside the primary proving environment.
Method · Clean-session Bootstrap evaluation plus structured feedback on portability, clarity, usability, and observed benefit.
Result · In progress; no broad result is claimed.
Limitations · Participants, findings, and evidence remain private unless separately approved for release.
Evidence · Future public summaries will require owner approval and explicit evidence grading.
planned validationCross-project and cross-provider validation
Date · Planned
Scope · Multiple independent teams, project types, and reasoning providers.
Method · A repeatable protocol and comparable acceptance criteria are still to be finalized.
Result · Not yet established.
Limitations · No inference should be made from the planned study to a completed result.
Evidence · None yet; this is planned validation.
planned validationFederated reconstruction A/B benchmark
Date · Test A active from 2026-07-15
Scope · Reconstructing a blank AIRIL project from unprepared source roots, followed later by authority-graded project exports under controlled conditions.
Method · Test A records the archaeology path across T0–T7. Test B is planned to use bounded, provenance-bearing project exports. Equivalent controls and repeated independent runs are required.
Result · Test A is in progress. Test B has not run. No quantitative delta or validation result is claimed.
Limitations · The directive arrived after early Test A milestones, so precise T0–T2 timing was not captured prospectively. Different sessions, model variance, source changes, and context contamination must be controlled before comparison.
Evidence · An internal experiment log is active; publication and any quantitative claim require owner approval and repeatable evidence.